Number | Client | Project Description |
---|---|---|
1 | Shell Egypt factory | Dust Suppression station/Water evaporator at 2,600 barrel/day |
2 | Egyptian Steel | 10 MW Medium Tension Station |
3 | MBC media channels | 4 MW Standby Station |
4 | Petrogulf Misr | 1 MW Standby Station |
5 | Sukari Gold mine | 40 MW Load Bank for main Power Station testing |
6 | SCIMITAR Production Egypt LTD. | 4 MW Gas Power Plant |
7 | PETROBEL (Belayim Petroleum Company) | 1.1 MW Gas Power Plant |
8 | SCIMITAR Production Egypt LTD. | Brackish Water desalination plant at 1,200 m3/day |
9 | DAPETCO (Double South Dabaa Petroleum Company) | Water Flooding/Disposal systems Injection rates: 40,0000 bbls/day Pressure 1,500 PSI Main stages: - Filtration system - Pumping system - Chemical injection system |
10 | Aurora Bay Resort Marsa Allam | Supplying, Operating and Maintaining 4MW Power Station Synchronized sets with standby power. Operation is 24/7 started since 2015 till now. |
11 | Marsa Shagra Village resort | Supplying, Operating and Maintaining 2MW Power Station Synchronized sets with standby power. Operation is 24/7 started since 2015 till now. |
12 | Dream Lagoon Resort Marsa Allam | Supplying, Operating and Maintaining 1MW Power Station Synchronized sets with standby power. Operation is 24/7 started since 2015 till now. |
13 | Royal Tulip Beach Resort | Supplying, Operating and Maintaining 2MW Power Station Synchronized sets with standby power. Operation is 24/7 started since 2015 till now. |
14 | Hassan Allam Sons Berenice Airport | Sea Water Desalination Plant (by Reverse Osmosis Technology). Operation is 24/7 started since 2018 till now. |
15 | Red Sea Makady Resort | Sea Water Desalination Plant (by Reverse Osmosis Technology). Operation is 24/7 started since 2016 till now. |
16 | Rixos Alamein Resort | Sea Water Desalination Plant (by Reverse Osmosis Technology). Operation is 24/7 started since 2016 till now. |
17 | Daltex Farms | Supplying, Operating and Maintaining 3MW Power Station Synchronized sets with standby power. Operation is 24/7 started since 2015 till now. |
18 | National Oilwell Varco | Supplying 2 MW Medium tension remote testing facility operated at 60HZ since 2013 till now. |